What to prepare
Build the layout around the appliances and fixtures you expect to use. Note door swings, tall storage and the counter space you need beside work areas. Verify model dimensions and clearances before approving cabinet drawings.
What to confirm
Confirm who measures on site and how changes will be coordinated with countertops, electrical and plumbing. Build the schedule around actual delivery and installation dates once those are available.
